11/17/2023 0 Comments Parking cost at kansas city airportThe new Kansas City airport terminal and seven story parking garage are nearing completion with an estimated opening in March 2023 In addition to art, Meyer says entertainment is planned for the terminal.Ĭonstruction on the terminal began in 2019, and despite the pandemic, the project is still on time and on budget.Īfter the terminal is complete, construction at the airport will continue with reconditioning of the airport’s primary, and 2 mile-long, runway. Thanks to the City’s One Percent for Art Program that requires all municipal building construction, reconstruing or remodeling to set aside 1% of the project’s estimated cost for art, visitors to the terminal will enjoy a great deal of original art throughout the terminal. “So, you can see, ‘Two lanes over, halfway down, there’s a green light. “Rather than having to drive up and down lanes looking for a parking space, there’ll be indicators above each parking stall to indicate whether it’s occupied or open,” Meyer said. Similar technology will be used in the airport’s new seven-story, 6000-space parking garage, which will be located across from the new terminal. The new airport’s many technology improvements include moving walkways, charging areas and heat-sensored lights above the bathroom stalls that turn red when the stall is occupied, and green when a stall is open. Meyer said the gate areas are significantly larger and the boarding bridges to the airplanes are constructed of glass, giving passengers a view of what’s going on around them. Beyond security, there will be around 50 restaurants and retail spaces in the news terminal, with many built around Kansas City themes like barbecue and areas, like the River Market.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |